It won a contract for the supply of two new ‘h-system’ process controls systems for thickness and flatness automatic control to Shandong Zouping Great Wall Energy Technology.
The 2 h-systems will be installed on Chinese supplied rolling mills. The first system will be installed on a non-reversing Cold Rolling Mill and the second system will be installed on a Foil Rolling Mill.
Fata will also will supply a further hSystem which will be installed on the second Chinese Cold Rolling Mill bought by Shandong Deli Group. The first system was successfully installed on the first Cold Mill in 2009.
The h-system will be installed on a 1900mm non-reversible Cold Mill.